The works involve the improvement and expansion of Aymeh intersection on Tafileh–Amman highway, in addition to the reconstruction and rehabilitation of the access road to Aymeh. The scope also includes the construction of retaining walls of various heights in locations requiring structural support and roadway protection. Furthermore, the project comprises the installation of water network pipelines using ductile iron and steel pipes, along with sewer connections in accordance with the specifications of the Water Authority, as well as the execution of stormwater drainage works to ensure proper surface runoff. The works also involve the improvement of local access roads connected to the main route, the demolition of the existing administration building of the Directorate of Industry and Trade (Tamween Department) and the construction of a new building with an approximate area of 320 m², in addition to dismantling the existing weighbridge and installing a new 80-ton weighbridge in compliance with the project specifications.