Phosphate Mining -T2025/2W
Image
Al-Abyad Mine
Image
image
Phosphate Mining -T2025/2W

Our company collaborates with the Jordan Phosphate Mines Company through the execution of projects at various mining sites in Al-Shidiya, Al-Hissa, and Al-Abyad. These projects cover the full operational cycle, starting with drilling and extraction, followed by crushing and processing, and concluding with loading and transporting phosphate to storage areas or shipping stations.


With a total value exceeding 140,111,092 Jordanian Dinars, this partnership reflects our ability to manage and deliver large-scale projects with high efficiency and reliability.


The works include removing the topsoil and overburden (IW1, IW2), mining phosphate from layers (L1, L2, L3), crushing, screening, and reducing moisture to a level not exceeding 3%, then transporting the material to the Al-Wadi Al-Abyad Mine yards and loading it onto external haul trucks and/or crushers. The tender also covers mining phosphate from layers (L1, L2, L3), crushing, screening, and transporting approximately 2.8 million tons of phosphate from Ore Zone 42 South to Al-Abyad Mine.

Client
Jordan Phosphate Mines Company
Duration
72 Months
Project Status
Ongoing
Location
Al-Abyad Mine, Jordan